Verification: Operations Wiring (Phase 3)
Verification: Operations Wiring (Phase 3)
Section titled “Verification: Operations Wiring (Phase 3)”Traceability between requirements and the Design §10 catalog.
| Requirement | Verified by | Level | Status |
|---|---|---|---|
| REQ-OPS-001 | BV-4-05 — full existing email-module unit + integration suites pass unchanged post-lift | Unit + Integration | planned |
| REQ-OPS-002 | BV-3-03 + existing EmailSenderTest behaviors preserved | Unit | planned |
| REQ-OPS-003 | BV-2-03 — helm template golden assertions (ESO + local branches) | Unit | planned |
| REQ-OPS-004 | BV-5-03 — startup with valid block; config endpoint sanitizes the token | Integration | planned |
| REQ-OPS-005 | BV-5-01 (absent block → no sender, normal boot), BV-5-03 (sender constructed) | Integration | planned |
| REQ-OPS-006 | BV-5-02 (malformed → boot failure) | Integration | planned |
| REQ-OPS-007 | BV-4-06 — authored here, executed at the Phase 4 dev gate | E2E (deferred execution) | planned |
| REQ-OPS-008 | Review: diff contains no webhook install and no new persistence for system sends | Review | planned |
Copyright: (c) Arda Systems 2025-2026, All rights reserved
Copyright: © Arda Systems 2025-2026, All rights reserved