Skip to content

Verification: Operations Wiring (Phase 3)

Traceability between requirements and the Design §10 catalog.

RequirementVerified byLevelStatus
REQ-OPS-001BV-4-05 — full existing email-module unit + integration suites pass unchanged post-liftUnit + Integrationplanned
REQ-OPS-002BV-3-03 + existing EmailSenderTest behaviors preservedUnitplanned
REQ-OPS-003BV-2-03helm template golden assertions (ESO + local branches)Unitplanned
REQ-OPS-004BV-5-03 — startup with valid block; config endpoint sanitizes the tokenIntegrationplanned
REQ-OPS-005BV-5-01 (absent block → no sender, normal boot), BV-5-03 (sender constructed)Integrationplanned
REQ-OPS-006BV-5-02 (malformed → boot failure)Integrationplanned
REQ-OPS-007BV-4-06 — authored here, executed at the Phase 4 dev gateE2E (deferred execution)planned
REQ-OPS-008Review: diff contains no webhook install and no new persistence for system sendsReviewplanned


Copyright: (c) Arda Systems 2025-2026, All rights reserved