Skip to content

Template: Test Plan

Author: Acceptance Test Engineer Date: YYYY-MM-DD Status: Draft | In Review | Approved Related Issue: [GitHub Issue link] Implementation Plan: [Link to implementation plan]

Brief description of what is being tested, referencing the Product Owner’s acceptance criteria and the Principal Engineer’s implementation plan.

#ScenarioMethodEndpointExpected ResultTags
1Create [entity] — happy pathPOST/api/v1/[entity]201; body matches schemaremote
2Get [entity] by IDGET/api/v1/[entity]/{id}200; body matches created entityremote
3[Validation failure scenario]POST/api/v1/[entity]400; error message describes violationremote
#ScenarioPage(s)User FlowExpected Result
1[User completes workflow][page names][step-by-step flow][visible outcome]
2[Error handling scenario][page names][step-by-step flow][error message / behavior]
Acceptance CriterionAPI Test #E2E Test #Status
[Criterion from user story]1, 21Planned
[Criterion from user story]3Planned
  • Fixtures: Describe seed data, configuration files or setup/teardown scripts required.
  • Environment: Specify which environment(s) the tests target (local, dev, stage).
  • Bruno collection path: api-test/[collection]/[suite]/
  • Playwright spec path: arda-frontend-app/e2e/specs/[spec-file].spec.ts
  • Page objects: arda-frontend-app/e2e/pages/[page].ts
  • List any testing risks (e.g., environment instability, data dependencies, timing sensitivity).
  • Describe how these tests integrate into the deployment pipeline (which Makefile targets, GitHub Actions workflows, tags).