Run 3 Session Log
Date: 2026-03-25
Branch: jmpicnic/uc-stories (ux-prototype)
Checkpoint commit: c19cb95 (rebased onto base branch)
Summary
Section titled “Summary”All tasks completed. 10 stories + 3 description.mdx (2 scenario + 1 UC level) delivered. All gate checks pass post-rebase.
Execution
Section titled “Execution”- 2 parallel agents (fe-preview, fe-confirm) implemented the 10 stories.
- All agents completed successfully. Post-agent fixes: eslint —fix only.
- No TypeScript errors, no lint warnings.
Deviations from Plan
Section titled “Deviations from Plan”None.
Gate Results
Section titled “Gate Results”| Check | Result |
|---|---|
| tsc —noEmit | Pass |
| lint (0 warnings) | Pass |
| unit tests | Pass |
| storybook build | Pass |
| rebase onto base | Clean (no conflicts) |
| post-rebase checks | All pass |